2026-11-03

6 Questions We Actually Get About PPG Coatings (Including One That's Not About Coatings)

I work in quality and brand compliance on the coatings side—my job is to review spec sheets, applicator submissions, and finished-coat documentation before a project gets signed off. Roughly 200 commercial projects a year cross my desk. Some of the questions below come from that work. One of them comes from our search logs and isn't even about our products. I'll answer all of them the way I'd answer a contractor on the phone: straight, with the caveats attached.

Is PPG coating made in America?

Some of it is. Not all of it, and not always in the way people assume.

PPG manufactures architectural and industrial coatings at several US plants, and certain product lines legitimately carry a Made in USA claim. But PPG is a global company with a global supply chain. Product origin can vary by line, by plant, and sometimes by batch. A coating blended and packaged in Ohio might still contain imported raw materials. That's normal in this industry—it just isn't always what a buyer hears when they see a flag on the label.

Per FTC guidelines (16 CFR Part 323), a "Made in USA" claim means "all or virtually all" of the product is made in the United States. That's a higher bar than most people realize. If a product is only assembled here from imported components, the label has to qualify the claim—something like "Made in USA with imported materials." The FTC does enforce this.

Here's something vendors won't tell you: the "made in America" question in coatings is often more about where the final product is blended and packaged than where every input came from. That's not a knock on anyone—it's just how the supply chain works. If your project has a Buy American or domestic-content requirement, don't rely on the label. Ask for the plant of manufacture and the certificate of origin for the specific SKU. That's not distrust. It's due diligence.

Where do I find PPG news today about coatings?

The boring answer is the right one: go to the source, not social media. PPG's newsroom and investor relations pages publish product launches, plant investments, and sustainability updates first. Trade publications pick them up a day or two later. LinkedIn posts show up whenever someone gets around to it.

If you're a specifier or a plant engineer, the "news" that actually matters usually isn't a press release. It's the technical bulletin or the updated data sheet—the one that tells you a formulation changed or a cure window shifted. Those updates don't trend. I don't have hard data on how many customers actually read them, but in my experience, the ones who do are the ones who don't get surprised mid-project.

What should I know about Madisonville commercial roof coatings?

A reader asked about a commercial roof coating project in Madisonville, and the question is a good one because roof coatings are where I see the most avoidable failures.

Three things drive the outcome, and none of them is the coating itself:

  • Substrate prep. "Standard prep" sounds precise. Put another way: it means whatever the spec writer and the contractor agreed it means, which is often not the same thing. A rusty metal deck, a ponding TPO membrane, and a weathered modified-bitumen roof need different prep, and skipping a primer on one of them will show up as an adhesion failure within a season.
  • Product selection for the roof type. There's no universal roof coating. A product that performs on metal might not be the right choice on single-ply. Match the product to the substrate and the exposure, not to the price sheet.
  • Cure-time discipline. Roof coatings need time to cure before top-coating or before weather exposure. In my first year on the spec desk, I approved a schedule that assumed "standard prep" included a primer on the metal section. It didn't. We caught it before application, but the schedule rework cost the project two days. Now I don't approve a roof schedule without a cure-time callout for every layer.

If you're specifying in Madisonville or anywhere with real seasonal temperature swings, add a note about application temperature range. Cure chemistry doesn't care about your deadline.

What small powder coating equipment actually matters?

Small powder coating equipment is a category where the equipment matters less than most people think—until it matters a lot.

For a small shop running occasional batches, the core setup is a manual electrostatic gun with a reliable ground, a dedicated oven that holds temperature evenly, and a clean spray area. You don't need a robotic line. You do need consistent grounding, because inconsistent ground is the number one cause of film-thickness variation on small runs.

I watched an applicator learn this the hard way. They skipped the grounding check on a new gun because it was "basically the same as the old one." That was the one time it mattered—200 parts came out with uneven film build and had to be re-shot. Not a catastrophe, but a full day and a wasted batch.

One more thing: don't buy equipment before you know which powder you're running. Some powders want a specific gun polarity or a specific cure schedule. The equipment catalog won't tell you that. The powder data sheet will.

How long after sealants can you chew gum?

This one isn't about our products. If you're searching this, you're almost certainly asking about dental sealants—and the honest answer is: ask your dentist. It depends on the specific sealant product and how it was applied, and I'm not going to pretend to give dental advice. That's outside our lane.

But since it keeps landing in our search logs, here's what's worth clarifying: "sealant" means something completely different in construction and industrial coatings. Our sealants cure by moisture or chemical reaction. The relevant question isn't chewing gum—it's when the sealant can be painted, top-coated, or exposed to weather. That's a cure-time question, and it's answered on the product data sheet for the specific SKU.

Typical construction and industrial sealants have two cure numbers: a skin-over time (when the surface stops being tacky) and a full-cure time (when the sealant reaches specified properties). Those numbers vary with temperature, humidity, and joint design. I don't have hard data on how often contractors confuse skin-over with full cure, but based on the failed inspections I've reviewed, it's frequent enough that we now require cure-time documentation on every submittal.

What do you wish customers knew before they send a spec?

The data sheet is not the product. It's a set of test results under specified conditions. If your conditions aren't those conditions, the numbers don't transfer one-to-one.

I wish more spec writers would tell us the actual service environment—temperature range, chemical exposure, substrate condition, application method—before they ask for a product recommendation. When someone sends a spec with just a part number and a deadline, we can match it. When they tell us the environment, we can tell them whether that part number is the right call. Those are different conversations.

That's been my experience with architectural and industrial coatings. Automotive refinish has its own logic, and I wouldn't speak to it with the same confidence. But the principle holds across the lines I do work on: the more context you give the spec desk, the fewer surprises end up on the roof.

Need the document package behind this topic?

Ask Henkel for the relevant SDS, TDS, test method references, and regulatory statements before qualification.

Download our 2025 Report